
Dining Hall Kitchen Floor Poured
Dec. 17, 2009
The dining hall has been enclosed for the winter which means our electricians and sound techs can pull the wiring in a warm building. The first layer of insulation has been sprayed and interior walls are being erected. Also, the cement floor in the kitchen has been poured. Mark and Al are busy building the stairs so that workers can access all three levels of the dining hall.